1. <tbody id="8f4ph"></tbody>
      1. <menuitem id="8f4ph"><dfn id="8f4ph"><menu id="8f4ph"></menu></dfn></menuitem>
      2. <track id="8f4ph"><div id="8f4ph"></div></track>

        This website uses cookies. For more information check our policy.

        Agree

        Relevant information for media representatives

        Downloads

        Here you will find several documents for your information. You can download the files on any device and use them for print and online media with the appropriate source notice (Herrenknecht AG).

        Company profile

        The market leader of mechanized tunnelling technology at a glance

        Download (234.7 KB)
        Logo

        If in connection with reporting on Herrenknecht AG you need to use the Herrenknecht AG logo, please contact us. 

        Download (1.3 MB)
        Breakthrough by TBM “Alice” for the Waterview Connection project in Auckland, EPB Shield, ? 14,410 mm
        Breakthrough by TBM “Alice” for the Waterview Connection project in Auckland, EPB Shield, ? 14,410 mm
        Download (541.4 KB) Download (28.4 MB)
        Completed tunnel for a gas pipeline underneath the Qiantang River in China, AVND3080AH, ? 3,780 mm
        Completed tunnel for a gas pipeline underneath the Qiantang River in China, AVND3080AH, ? 3,780 mm
        Download (346.0 KB) Download (26.2 MB)
        Completed tunnel for the Eurasia Tunnel project, Istanbul, Mixshield, ? 13,660 mm
        Completed tunnel for the Eurasia Tunnel project, Istanbul, Mixshield, ? 13,660 mm
        Download (423.4 KB) Download (25.4 MB)
        Completed tunnel for the M-30 road tunnel in Madrid, Spain, EPB Shield, ? 15,200 mm
        Completed tunnel for the M-30 road tunnel in Madrid, Spain, EPB Shield, ? 15,200 mm
        Download (660.2 KB) Download (31.5 MB)
        Direct Pipe method at the Tioga County Extension Project nearby New York City, USA
        Direct Pipe method at the Tioga County Extension Project nearby New York City, USA
        Download (394.3 KB) Download (20.1 MB)
        Double Shield TBM for an urban sewage tunnel for the Mega Metropolis Hongkong, ? 8,280 mm
        Double Shield TBM for an urban sewage tunnel for the Mega Metropolis Hongkong, ? 8,280 mm
        Download (697.1 KB) Download (28.9 MB)
        Double Shield TBM for a hydropower project in Dominican San Juan de la Maguana, ? 4,500 mm
        Double Shield TBM for a hydropower project in Dominican San Juan de la Maguana, ? 4,500 mm
        Download (717.3 KB) Download (30.8 MB)
        Double Shield TBM for the Coca Codo Sinclair Hydropower Project in San Miguel, Ecuador, ? 9,040mm
        Double Shield TBM for the Coca Codo Sinclair Hydropower Project in San Miguel, Ecuador, ? 9,040mm
        Download (485.2 KB) Download (27.4 MB)
        Dr.-Ing. E. h. Martin Herrenknecht at a breakthrough celebration at Gotthard Base Tunnel, Gripper TBM, ? 8,830 mm, October 26, 2006
        Dr.-Ing. E. h. Martin Herrenknecht at a breakthrough celebration at Gotthard Base Tunnel, Gripper TBM, ? 8,830 mm, October 26, 2006
        Download (340.3 KB) Download (28.9 MB)
        EPB machine for an protective power tunnel at the National Grid Project in London, Great Britain, EPB4000AH, ? 4,700 mm
        EPB machine for an protective power tunnel at the National Grid Project in London, Great Britain, EPB4000AH, ? 4,700 mm
        Download (500.5 KB) Download (27.2 MB)
        EPB Shield for the Crossrail project in London at workshop acceptance, ? 7,080 mm
        EPB Shield for the Crossrail project in London at workshop acceptance, ? 7,080 mm
        Download (357.2 KB) Download (20.4 MB)
        Final breakthrough at the Gotthard Base Tunnel on 15 Oct. 2010, Switzerland, Gripper TBM, ? 9,430mm
        Final breakthrough at the Gotthard Base Tunnel on 15 Oct. 2010, Switzerland, Gripper TBM, ? 9,430mm
        Download (711.2 KB) Download (32.0 MB)
        First ever breakthrough by a Variable Density TBM, Klang Valley project in Kuala Lumpur, ? 6,620 mm
        First ever breakthrough by a Variable Density TBM, Klang Valley project in Kuala Lumpur, ? 6,620 mm
        Download (639.7 KB) Download (29.3 MB)
        Gripper TBM for the Gotthard Base Tunnel, Gripper TBM, ? 8,830mm
        Gripper TBM for the Gotthard Base Tunnel, Gripper TBM, ? 8,830mm
        Download (561.5 KB) Download (28.8 MB)
        Headquarters Herrenknecht AG in Schwanau, Germany-PreviewImage   Headquarters Herrenknecht AG in Schwanau, Germany
        Headquarters Herrenknecht AG in Schwanau, Germany-PreviewImage Headquarters Herrenknecht AG in Schwanau, Germany
        Download (474.7 KB) Download (26.4 MB)
        Inner-city TBM jobsite for building a metro line in Shenzhen, China, ? 6,250 mm
        Inner-city TBM jobsite for building a metro line in Shenzhen, China, ? 6,250 mm
        Download (474.8 KB) Download (27.3 MB)
        Jobsite assembly of an EPB Shield for the metro in Singapore, ? 6,600mm
        Jobsite assembly of an EPB Shield for the metro in Singapore, ? 6,600mm
        Download (521.9 KB) Download (29.1 MB)
        Jobsite assembly of the at that time world's largest TBM for the Sparvo road tunnel in Italy, EPB Shield, ? 15,550 mm
        Jobsite assembly of the at that time world's largest TBM for the Sparvo road tunnel in Italy, EPB Shield, ? 15,550 mm
        Download (473.9 KB) Download (26.3 MB)
        Jobsite assembly of the Gripper TBM for the L?tschberg Tunnel, Switzerland, ? 9,430mm
        Jobsite assembly of the Gripper TBM for the L?tschberg Tunnel, Switzerland, ? 9,430mm
        Download (441.5 KB) Download (25.6 MB)
        Launch shaft for an AVN machine crossing the River Elbe in Hetlingen, Germany, ? 3,025 mm
        Launch shaft for an AVN machine crossing the River Elbe in Hetlingen, Germany, ? 3,025 mm
        Download (558.2 KB) Download (28.4 MB)
        Launch shaft for the Crossrail project in London, Great Britain, EPB Shield, ? 7,080mm
        Launch shaft for the Crossrail project in London, Great Britain, EPB Shield, ? 7,080mm
        Download (400.5 KB) Download (25.4 MB)
        Launch shaft for the Eurasia Tunnel on the Asian side of the Bosporus, Istanbul, Mixshield, ? 13,660 mm
        Launch shaft for the Eurasia Tunnel on the Asian side of the Bosporus, Istanbul, Mixshield, ? 13,660 mm
        Download (642.4 KB) Download (29.8 MB)
        Launch shaft of a microtunnelling jobsite in Lünen, Germany, EPB1400TB, ? 1,740 mm
        Launch shaft of a microtunnelling jobsite in Lünen, Germany, EPB1400TB, ? 1,740 mm
        Download (418.2 KB) Download (25.5 MB)
        Launch shaft of a sea outfall project in Rabat, Marocco, AVND2200AB, ? 2,665 mm
        Launch shaft of a sea outfall project in Rabat, Marocco, AVND2200AB, ? 2,665 mm
        Download (661.6 KB) Download (28.8 MB)
        Lined tunnel tube at the Gotthard Base Tunnel, Gripper TBM, ? 9,430mm
        Lined tunnel tube at the Gotthard Base Tunnel, Gripper TBM, ? 9,430mm
        Download (257.4 KB) Download (23.2 MB)
        Loading a heavyweight cutting wheel segment onto a transport vessel in the Port of Kehl, Germany
        Loading a heavyweight cutting wheel segment onto a transport vessel in the Port of Kehl, Germany
        Download (383.9 KB) Download (19.9 MB)
        Microtunnelling at Brandenburg Gate in Berlin, Germany, AVN1200TC, ? 1,200 mm
        Microtunnelling at Brandenburg Gate in Berlin, Germany, AVN1200TC, ? 1,200 mm
        Download (625.7 KB) Download (27.3 MB)
        Microtunnelling launch shaft at a sewage project in Warsaw, Poland
        Microtunnelling launch shaft at a sewage project in Warsaw, Poland
        Download (612.9 KB) Download (29.7 MB)
        Mixshield for the Shanghai Changjiang road tunnel, China, Mixshield, ? 15,430 mm
        Mixshield for the Shanghai Changjiang road tunnel, China, Mixshield, ? 15,430 mm
        Download (518.1 KB) Download (30.3 MB)
        Multi-mode TBM shortly before tunnel advance starts at the Filder Tunnel, Germany, ? 10,830 mm
        Multi-mode TBM shortly before tunnel advance starts at the Filder Tunnel, Germany, ? 10,830 mm
        Download (377.2 KB) Download (23.8 MB)
        Pipelining laying technique for a huge gas pipeline in Turkmenistan, HDD-rig HK400M
        Pipelining laying technique for a huge gas pipeline in Turkmenistan, HDD-rig HK400M
        Download (537.4 KB) Download (25.3 MB)
        Target shaft in Düsseldorf for the Wehrhahn Line, Germany, Mixshield, ? 9,490mm, 14 Dec. 2011
        Target shaft in Düsseldorf for the Wehrhahn Line, Germany, Mixshield, ? 9,490mm, 14 Dec. 2011
        Download (481.1 KB) Download (27.9 MB)
        Utility tunnelling machine for the urban construction of sewage tunnels in Panama City, Panama, EPB3000AH, ? 3,670 mm
        Utility tunnelling machine for the urban construction of sewage tunnels in Panama City, Panama, EPB3000AH, ? 3,670 mm
        Download (451.7 KB) Download (25.8 MB)
        Vertical shaft sinking machine VSM9000 constructing an urban shaft in Naples, Italy
        Vertical shaft sinking machine VSM9000 constructing an urban shaft in Naples, Italy
        Download (509.7 KB) Download (30.8 MB)
        Workshop assembly of a Multi-mode TBM for the Stuttgart 21 railway project, Germany, ? 10,830 mm
        Workshop assembly of a Multi-mode TBM for the Stuttgart 21 railway project, Germany, ? 10,830 mm
        Download (352.2 KB) Download (21.2 MB)

        Moving images for moving insights

        Please find films and animations of Herrenknecht on the Youtube corporate channel.

        Watch our videos

        Your contact person Contact us

        Achim Kühn Head of Group Marketing and Corporate Communications
        夜夜骑